From Dale, our project leader at MMS Aviation:
"The front floor is in and the rear is going in. The horizontal is about half way through the repair. The paint has arrived and that means that as soon as we finish the Horizontal stab, we can get the wing, strut, door, gear fairings, flap, aileron and horizontal stab painted."
"The front floor is in and the rear is going in. The horizontal is about half way through the repair. The paint has arrived and that means that as soon as we finish the Horizontal stab, we can get the wing, strut, door, gear fairings, flap, aileron and horizontal stab painted."
No comments:
Post a Comment