Monday, November 23, 2009

Aircraft Update & Pics



Here's today's email from Mickey at the refurbishment shop in OK.

"The engine is running fine with no problems, the new fuel pressure gauge that was furnished with the engine mod. is stuck on 12 lbs. so will be contacting Donna at Davis to see if they can get us another one shipped in here tomorrow.

The IFR certification has been completed OK, the altimeter needle was dragging so we had another altimeter installed. The avionics shop in Mena replaced a static line because of a leak and did not do an IFR certification but the avionics shop in Wichita still found a static leak that had to be repaired."

No comments:

Post a Comment